99久久精品国产免费看_亚洲欧美日韩第一_成人免费视频视频在线观看 免费_午夜激情诱惑福利_成人无码区免费a∨_97影院在线理论_中文字幕av无码专区不卡_看亚洲A级一级毛片在线电影_欧美日韩国内中文字幕_国产高清福利成人

電子煙外殼

常見問題

product

contact

Xingsheng Aluminum Products Co., Ltd.

Contact: Manager Zhu

Mobile:13823785330

Phone:0755-27621099

fax:0755-23701135

email:gd@szxslc.com

Website:http://mbdg.com.cn

Website:http://www.szxslzp.com

address:1-3 / F, building D, Xinwei second industrial zone, Datian street, Gongming, Guangming New District, Shenzhen



common problem

Your current location: Home >> 常見問題 >> common problem
  • QCan the product be customized? How much and how long does customization take?

    AIt can be customized according to the size structure of the customer's drawings. As for the customized quantity, in order to reduce the pressure of customers, there is no requirement for the first two batches of trial production quantity, but the third batch needs to reach 3000 PCs before production. (customization cycle: mold sample time: 7-9 days; finished product sample time: about 3 days; 7 days after sample confirmation.)

  • --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

  • QIs the product delivered by express or by door?

    A If the quantity reaches 3000pcs, it will be delivered to the door in Shenzhen City, and it will be sent by express delivery or logistics outside Shenzhen according to the quantity.

  • --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

  • QCan the first batch of products be delivered in a few days?

    AStarting from your confirmation of the sample, delivery will start in 7-9 days.

  • --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

  • QHow many days does it take to open the mold? How many days does it take for the mold to open and sample?

    AIt takes 7-9 days to open the mold, and about 3 days for the first batch of samples.

  • --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------


Contact

Xingsheng Aluminum Products Co., Ltd.

Contact :Manager Zhu

Mobile:13823785330 

Email:gd@szxslc.com

phone:0755-27621099

Fax:0755-23701135

URL:http://mbdg.com.cn

URL:http://www.szxslzp.com


深圳鋁合金外殼廠家

Copyright © http://www.szxslzp.com 深圳市興昇鋁制品有限公司 proAluminum shell processing,Aluminum profile shell,Aluminum alloy shell manufacturers, advisory!
粵ICP備18024264號-1 Powered by company_b technologyChinese Enterprise Cube